Meta Temple TX Campus
AI dedicatedOperated by Meta · Temple, TX, US3 srcupdated 3mo ago
https://www.meta.com/data-centers/temple/
Meta's Temple, Texas campus — two buildings, 760,000+ sq ft — which went live in July 2026 as the first facility to open with Meta's AI-optimised datacenter design. Meta states $1.2bn invested and ~100 operations roles but publishes no capacity figure; the ~198MW here is from local reporting, not from Meta. Electricity is supplied by Oncor and matched 100% with renewables.
Compared to peers
Compared with 166 peer facilities in US.
- Current capacity
- 198 MWno peers
- median 0 · p95 387
- Supplier coverage
- 0no peers
- median 0 · p75 0
- Announce → online lag
- in progress
- no completions yet
Bands compare operating capacity with the peer median. Planned capacity is shown separately and is not added.
Ownership chain (Meta)
No ownership chain tracked yet for this entity. Investigators can add parent companies via the ownership_edge table or community findings.
Public subsidies & incentives
No subsidies, tax abatements, or public incentives recorded for this facility yet.
Permits
No permits tracked for this facility yet. Public records (county permits, environmental filings, grid interconnect filings) can be sourced via community findings.
Timeline
- Announced
- —
- Groundbreak
- —
- Online
- —
- Full capacity
- —
Power
- Primary source
- grid-mixed
- Utility
- Oncor Electric Delivery
- PUE pledged
- —
Suppliers (0)
No suppliers tracked yet. Sign in to contribute.
Sources (3)
- operatorMeta Temple
- operatorMeta Temple Data Center (one-pager)
- newsMeta goes live in Temple with $1.2 billion AI data center2026.7.22
Community findings (0)
No findings submitted yet. Sign in to dispute or correct facts.