Crusoe / Lancium Childress AI Data Center Campus

AI dedicated

Operated by Crusoe · Childress, TX, US2 srcupdated 3mo ago

https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas

Announced 15 July 2026 by Crusoe and Lancium as a 1.0 GW AI data center campus on 270 acres of Lancium-owned land in Childress County, Texas. Crusoe designs, builds and operates; Lancium owns the land and manages power interconnection and energy infrastructure. Construction is stated to begin in Q3 2026, with a closed-loop non-evaporative liquid cooling system.

Compared to peers

Compared with 166 peer facilities in US.

Current capacity
—
median 0 · p95 387
Planned capacity
1,000 MW
Supplier coverage
0no peers
median 0 · p75 0
Announce → online lag
in progress
no completions yet

Bands compare operating capacity with the peer median. Planned capacity is shown separately and is not added.

Ownership chain (Crusoe)

No ownership chain tracked yet for this entity. Investigators can add parent companies via the ownership_edge table or community findings.

Public subsidies & incentives

No subsidies, tax abatements, or public incentives recorded for this facility yet.

Permits

No permits tracked for this facility yet. Public records (county permits, environmental filings, grid interconnect filings) can be sourced via community findings.

Status
announced
Current capacity
—
Planned capacity
1,000 MW
Power source
grid-mixed
Cooling
closed-loop
Water draw
—
PUE
—
Capex
—

Location

City
Childress
Region
TX
Country
US
Coordinates
34.4265, -100.2043
View on OpenStreetMap →

Timeline

Announced
—
Groundbreak
—
Online
—
Full capacity
—

Power

Primary source
grid-mixed
Utility
—
PUE pledged
—

Suppliers (0)

No suppliers tracked yet. Sign in to contribute.

Sources (2)

Community findings (0)

No findings submitted yet. Sign in to dispute or correct facts.