Stargate — Abilene Campus
AI dedicatedOperated by OpenAI · Abilene, TX, US1 srcupdated 1d ago
First Stargate site under the OpenAI / Oracle / SoftBank joint venture, targeting up to 1.2 GW for AI training workloads.
Compared to peers
Compared with 117 peer facilities in US.
- Capacity (MW)
- 1,2005×+ above median
- median 32 · p95 1,560
- Supplier coverage
- 9no peers
- median 0 · p75 0
- Announce → online lag
- in progress
- no completions yet
Bands describe deviation from peer median; not a judgment.
Ownership chain (OpenAI)
Ownership opacity: 28 / 100 — transparent2 layers traced
- L0 (entity)OpenAIcorporationUS
- L1 (top)OpenAI Inc. (Nonprofit)non-profitUSsrc ↗
Opacity score combines jurisdiction secrecy and chain depth (≥3 layers = +10, ≥4 = +20). Descriptive only — high opacity warrants review, not accusation.
Public subsidies & incentives
Total disclosed
$290.0M
Claimed jobs
700
$/job claimed
$414k
- Abilene ISD / Taylor County (Chapter 403 — JETI)US-TX · tax-abatement$290.0Mannounced 2024.9.04 · 10y term · 350 jobs claimed
- City of Abilene / Taylor County (85% abatement) + JETIUS-TX · tax-abatementannounced 2024.9.04 · 10y term · 350 jobs claimed
Permits
- grid interconnectERCOTpendingapplied 2024.7.12 ·
- zoningTaylor County / City of Abilenegrantedapplied 2024.8.05 · issued 2024.9.23 · 49d lag
- environmentalTexas Commission on Environmental Quality (TCEQ)grantedapplied 2024.10.30 · issued 2025.1.21 · 83d lag
- buildingCity of Abilene Building Inspectiongrantedissued 2024.10.08
- grid interconnectBehind-the-meter (Crusoe / Lancium 360MW gas microgrid; no ERCOT large-load interconnect for primary power)granted
Status
under-construction
Current capacity
—
Planned capacity
1200 MW
Power source
gas
Cooling
direct-to-chip
Water draw
—
PUE
—
Capex
$15.0B
Timeline
- Announced
- —
- Groundbreak
- —
- Online
- —
- Full capacity
- —
Power
- Primary source
- gas
- Utility
- ERCOT
- PUE pledged
- —
Suppliers (9)
- Solaris Energy Infrastructure1 srcbackup-power · On-site mobile gas turbines
- Kiewit1 srccivil · Civil works / EPC partner
- Vertiv1 srccooling · Liquid cooling for GB200 deployments
- Lancium1 srcelectrical · Clean Campus power infra / grid interconnection
- Oncor Electric Delivery1 srcelectrical · Utility transmission interconnect · local
- Lumen Technologies1 srcfiber · Dedicated fiber routes for AI workloads
- DPR Construction1 srcgc · GC for data center buildings
- NVIDIA1 srchardware · GB200 NVL72 GPU systems
- GE Vernova1 srctransformer · Gas turbines + grid power equipment
Sources (1)
Community findings (0)