[J] MEEDOEN

Meta Temple TX Campus

AI dedicated

Operated by Meta · Temple, TX, US3 srcupdated 3mo ago

https://www.meta.com/data-centers/temple/

Meta's Temple, Texas campus — two buildings, 760,000+ sq ft — which went live in July 2026 as the first facility to open with Meta's AI-optimised datacenter design. Meta states $1.2bn invested and ~100 operations roles but publishes no capacity figure; the ~198MW here is from local reporting, not from Meta. Electricity is supplied by Oncor and matched 100% with renewables.

Compared to peers

Compared with 166 peer facilities in US.

Current capacity
198 MWno peers
median 0 · p95 387
Supplier coverage
0no peers
median 0 · p75 0
Announce → online lag
in progress
no completions yet

Bands compare operating capacity with the peer median. Planned capacity is shown separately and is not added.

Ownership chain (Meta)

No ownership chain tracked yet for this entity. Investigators can add parent companies via the ownership_edge table or community findings.

Public subsidies & incentives

No subsidies, tax abatements, or public incentives recorded for this facility yet.

Permits

No permits tracked for this facility yet. Public records (county permits, environmental filings, grid interconnect filings) can be sourced via community findings.

Status
operational
Current capacity
198 MW
Planned capacity
—
Power source
grid-mixed
Cooling
closed-loop
Water draw
—
PUE
—
Capex
$1.2B

Location

City
Temple
Region
TX
Country
US
Coordinates
31.0982, -97.3428
View on OpenStreetMap →

Timeline

Announced
—
Groundbreak
—
Online
—
Full capacity
—

Power

Primary source
grid-mixed
Utility
Oncor Electric Delivery
PUE pledged
—

Suppliers (0)

No suppliers tracked yet. Sign in to contribute.

Sources (3)